4. Adding the Stem Walls

side-wall-insulated

A side stem wall has been framed and bolted through the frame with four 1/2 inch bolts. Each bay of the wall gets insulated.

side-wall-going-in

Inside face of each wall is faced with doorskin. The outer face has 1/4 marine plywood face.

side-walls-ledge-brackets-in

Brackets to support the ledges have been attached to the side walls with lag screws. The foot of each bracket also rests in a stake pocket on the frame. Note: the project has been moved outside! New taillights attached to the rear brackets.

sides-ledge-brackets-ii

Framing the inner stem walls. These will be screwed down into the deck and into the cross members, and will also be insulated and skinned.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s